Interventions in the Turkish Demo Site

The Turkish demo site is a university hospital located in Aydin. It has three blocks, one of which has been the demonstrator under the BRICKER project. It covers an area of 19,467 square meters. The building was inefficient due to lack of insulation in the envelop walls and roof.

Image

The works have included:

7430 m2 insulation work on walls

3360 m2 insulation work on roof

1300 m2 ventilated façade

1300 m2 window film

2 solar fields

ORC cogeneration units

Adsorption chiller

Air-to-air heat exchangers on the roof for heat recovery

 

The active system uses an adsorption chiller unit with a nominal cooling capacity of 75 tons which has been installed in a purpose-built hangar near the hospital. The system’s ORC cogeneration units are fed by the sun-tracking parabolic trough collectors in the solar fields.

Energy cost (€/year) for combined active and passive solutions

Pre-BRICKER

Post-BRICKER

321,421

163,237

 

Primary energy savings (%)

Passive savings

Active savings

23

32

 

Annual CO2 savings (%)

Passive savings

Active savings

19

26