Over the summer the heat exchanger between the ORC unit and cooling tower was connected. The oil tank has been equipped with thermal oil supply circuits leading from the biomass boiler to the water/oil exchanger and the ORC unit. Transfer pipes have been delivered and hydraulic links installed. In parallel, the BRICKER system’s sensors and metering systems have been set up.
27 September 2017